| < To Phase 2 Gallery |
Phase 3 |
|
The next stage of the formation requires a large horse shoe cutting leading around to an 18 metre long trestle bridge. |
The next boulder being planted in the ground to form on of the abutments for the trestle bridge. |
Looking down on the new cutting. |
Track panels for the next section ready to go. |
Laying out the new panels in the horse shoe cutting. |
Looking back across the gap that the trestle bridge will span
|
The curve radius is checked and the second rail is clamped in position
ready for welding
|
Track laying progressing
|
Not much work going on here!!!
|
Work starts on the formation on the bottom side of the trestle bridge
site
|
Grading the batter on the bank
|
Looking down over the horse shoe curve
|
Work commences on the turn table main beam in the CNC mill
|
Machining work completed
|
Welding on the deck support beams
|
Track and hand rails are fitted
|
Rolling the circular rail for the turntable wheels to run on
|
The turntable is lowered onto the 2½" diameter pivot ball
|
Stabiliser wheels are welded into position
|
Timber deck being fitted
|
Brick work taking shape
|
The almost completed turntable
|
|
|
|
| < To Phase 2 Gallery |
Phase 3 |
|